Testing the project
From OpenMBD
Revision as of 15:35, 28 February 2019 by Hugo (talk | contribs) (Created page with "Finally, the new block can be tested. *Create a model that provides inputs for the twelve input ports, such as depicted below: File:example_usage.PNG *Build the model *The...")
Finally, the new block can be tested.
- Create a model that provides inputs for the twelve input ports, such as depicted below:
- Build the model
- The Diagnostic Viewer indicates that the build process completed successfully
- Test the generated application by programming the Olimexino board with the signal tower connected to 5V, GND, and D11 (if SPI1 was selected) or D34 (if SPI2 was selected).